S-34.1, r. 3 - Regulation respecting petroleum exploration, production and storage licences, and the pipeline construction or use authorization

Full text
56. The bidder having submitted the second highest bid may, at all times, withdraw from the process by notifying the Minister and the Régie de l’énergie, in writing. The Minister then returns that bidder’s auction guarantee.
O.C. 1253-2018, s. 56.
In force: 2018-09-20
56. The bidder having submitted the second highest bid may, at all times, withdraw from the process by notifying the Minister and the Régie de l’énergie, in writing. The Minister then returns that bidder’s auction guarantee.
O.C. 1253-2018, s. 56.